Matters needing attention during installation
The installed wall has a certain load-bearing capacity, which can bear the weight of the entire range hood.
If it is a hollow wall, the thickness of the solid layer of the hollow board must be ≥30mm. Concrete or solid wooden walls can directly drilled for installation holes.
The range hood must not come into contact with electrical wiring inside or outside the wall to prevent electrocution.
The range hood should not be installed in an environment with too much air convection, otherwise it will affect the smoke exhaust effect.
The distance between the outlet of the whole machine and the upper smoke outlet should be ≤15 meters as far as possible to avoid the flue being too and the flue being folded many times, which affects the smoke exhaust effect.
The flue is installed inside the cabinet or above the ceiling.
The gases discharged from the extractor fan must not be discharged into the flue of a appliance burning gas or other fuel.
The height of the cooking utensils on the gas stove must not be higher than the bottom of the range hood.
When the range hood is installed directly above the gas stove, this distance should be at least ≥65cm.
Due to the large weight and volume of the range hood, it is recommended to be lifted and installed by two people together.
When cutting or drilling into walls and ceilings, be careful not to damage wires and other hidden devices.
When drilling holes in the wall, it is strictly prohibited to drill holes too large to avoid the gap between the screw and the wall being too large, resulting inoseness and causing accidental falls.
Before the range hood is installed, be sure to cut off the power supply to avoid electric shock.
During installation, the installer should wear protective gloves to prevent cuts from the metal plates of the range hood.
If you cannot install it yourself, please arrange for a professional to come to your home for service.
Here are the installation reference diagrams for different models.



Method of installing the range hood
Install the mounting plate:
According to the size of the mounting hole of the hanging board, as shown in Figure 1, drill out two horizontal holes with a diameter depth of 50mm ~ 60mm at the corresponding position on the wall, and then put the expansion screws in, put in the fixing device tool 1. Drill out two holes horizontally at the corresponding position, and then put the expansion screws in, put in the hanging board.


Install the body:
Lift the range hood, align the hook at the back of the body with the hook of the mounting plate, and press it into place. Then shake the by hand to confirm that the hook at the back of the body has entered the hook of the mounting plate.
Install the vent pipe:
Insert the ventilation duct into the outlet, then secure the ventilation duct on both sides of the outlet with two screws, and then lead the other end of the ventilation to the outside, as shown in Fig. 2.

Finish the installation of the range hood.
Warm prompt:1.When installing the range hood, the appliance mounting device or mounting screws must be installed.
2.Fixture fixing device shall be subject to actual machine assembly.
Note:The above is for reference only.The actual installation should be based on the size of the body, the size of the kitchen space and the cargo fitting list.